VTTI Cooling Water Outfall Culvert
Construction of a 1.5 km long reinforced concrete culvert for the discharge of cooling water used at VTTI refinery. The works include excavation, trenching, concrete cast in-situ, pre-cast concrete, insulation, backfilling, soil formation and surveying works.
- Project Name:
- VTTI Cooling Water Outfall Culvert
- Client:
- Government of Fujairah – Fujairah Municipality
- Main Contractor:
- Fujairah Rock & Aggregate Co.
- Location:
- VTTI Terminal– UAE
- Year:
- 2012
- Category:
- Foundation works

