GPS Chemoil Shoring Works for Main Oily Water Pit

Design and installation of a temporary shoring wall by means of sheet pile sections (anchored and free standing) for the construction of the Main Oily Water Pit foundation and culvert foundation.

GPS Chemoil Shoring Works for Main Oily Water Pit

Design and installation of a temporary shoring wall by means of sheet pile sections (anchored and free standing) for the construction of the Main Oily Water Pit foundation and culvert foundation.

Project Name:
GPS Chemoil Shoring Works for Main Oily Water Pit
Client:
GPS Chemoil LLC FZC
Main Contractor:
Topaz Engineering
Location:
UAE
Year:
2012
Category:
Foundation works