VTTI Cooling Water Outfall Culvert

Construction of a 1.5 km long reinforced concrete culvert for the discharge of cooling water used at VTTI refinery. The works include excavation, trenching, concrete cast in-situ, pre-cast concrete, insulation, backfilling, soil formation and surveying works.

VTTI Cooling Water Outfall Culvert

Construction of a 1.5 km long reinforced concrete culvert for the discharge of cooling water used at VTTI refinery. The works include excavation, trenching, concrete cast in-situ, pre-cast concrete, insulation, backfilling, soil formation and surveying works.

Project Name:
VTTI Cooling Water Outfall Culvert
Client:
Government of Fujairah – Fujairah Municipality
Main Contractor:
Fujairah Rock & Aggregate Co.
Location:
VTTI Terminal– UAE
Year:
2012
Category:
Foundation works