Upper Zakum Fixed Boat Landings
Offshore handling and installation of 129 large diameter steel tubular piles in rock for fixed boat landing structures, including design, engineering, and fabrication of piling frames. Gulf Foundation was subcontracted to perform the following activities:
- Design and fabrication of all piling temporary works
- Pile installation
- Performing pile axial and lateral testing
- Project Name:
- Upper Zakum Fixed Boat Landings
- Client:
- Abu Dhabi National Oil Company (ADNOC)
- Main Contractor:
- National Marine Dredging Company (NMDC)
- Location:
- Upper Zakum Artificial Islands – UAE
- Category:
- Quay walls and jetties / Foundation works
- Year:
- 2014

