Port of Fujairah Control Tower Pile Foundation

Installation of driven cast in-situ vibro piles Ø 465 for the foundations of the new POF Control Tower.

Port of Fujairah Control Tower Pile Foundation

Installation of driven cast in-situ vibro piles Ø 465 for the foundations of the new POF Control Tower.

Project Name:
Port of Fujairah Control Tower Foundation
Client:
Port of Fujairah
Main Contractor:
Fujairah National Construction & Transport Co. (FNCT)
Location:
Port of Fujairah, Fujairah – UAE
Year:
2010
Category:
Foundation works